| Specification | Details |
|---|---|
| Material & Alloy | Molybdenum-alloyed manganese steel for the main structure; elastic rubber with two metal plates and reinforced plastic for vibration absorption; optional NR/SBR rubber for extended durability |
| Hardness | HB 200–250 (steel); Shore A 60–80 (rubber) |
| Standard Dimensions | Height: 100–150 mm; Width: 80–120 mm; Rubber thickness: 20–30 mm (depending on model); Mounting holes: 4–6 (M12–M16) |
| Approx. Weight | 5–15 kg (for 36-inch standard hydrocone model; lighter for rubber version) |
| Wear Resistance | High (resistant to vibration and impact; 20–30% longer lifespan with elastic rubber) |
| Manufacturing Process | Steel: cast from billet, not scrap + heat treated (normalizing) for durability; Rubber: vulcanized; Precise machining; Pre-assembled for immediate installation |
Initial consultation and information exchange
Initial consultation and information exchange
Place an order
Product loading and shipping
Primary use: Stabilizing the motor, reducing vibrations, and absorbing shocks in hydrocone crushers
Industries: Stone mining, sand and gravel production, road construction, secondary crushing of hard minerals
Compatibility: Novin Maseh-Saz hydrocones, models 36–2/3/4/5/6.5/8; suitable for heavy-duty production lines
Vibration reduction: Up to 50% reduction in vibration and mechanical shocks
Extended component life: Increases motor and machine part lifespan by up to 30%
Dynamic balance: Reduces torque fluctuations and improves overall efficiency while lowering energy consumption
Easy installation: Bolt-and-pin setup with high durability under wear and pressure
Cost-effective: Locally manufactured, OEM-quality options; available in rubber or steel variants
Consumable part: requires replacement every 6–18 months under heavy-duty operation; rubber components sensitive to oil and acids
Moderate weight may complicate handling; precise leveling required to avoid imbalance
Older models may be vulnerable to severe vibrations; proper cooling systems recommended
Installation: Clean mounting surfaces; attach one metal plate to the motor and another to the chassis using M12–M16 bolts; check leveling (clearance 0.05 mm); use hydraulic tools for secure fixing
Maintenance: Inspect every 500 hours for cracks or wear; avoid overload; replace rubber if hardness >10%; lubricate metal connections
Transport & Handling: Maximum 100 kg per pickup load (10–15 pieces); up to 15 tons per trailer (200+ pieces)

اگر دنبال خرید با چک هستی
همین الان تماس بگیر
Reviews
There are no reviews yet.